RIVER TERMINAL – GRIMSBY

CLIENT

Idealform

N

YEAR

2014

DURATION

50 Weeks

VALUE

£500,000.00

PROJECT DESCRIPTION

 

Design and construction of a Roll on–Roll off terminal in the River Humber outside the entrance to Grimsby Docks for importing cars from mainland Europe. The new facility accommodates vessels of up to 165m in length and 26m beam with an operating draft of 7.1m.

Installation of 165 large diameter tubular steel piles, varying in diameter from 762mm up to 1420mm dia, 30 of which are raking piles. Pile lengths are up to 38m, with embedment of up to 27m in places.
Floating concrete pontoon, 80m x 30m x 5m deep, constructed in a dry dock in Newcastle

KEY FEATURES

 

  • Finger pier extending from floating pontoon
  • Floating pontoon to allow vehicles to turn on when they are loading / unloading
  • A piled approach jetty and 70m linkspan to provide access between the approach jetty and the pontoon at all tides
  • A 250m long approach jetty

In

Partnership

With

D’Suza Group HQ

Hi-Spec House
14 Liverpool Road
Warrington
WA5 1EE

D’Suza Group London

1 Northumberland Avenue 
Trafalgar Square 
London
WC2N 5BW

Useful Links:

- Sitemap
- Privacy Policy
- Responsibilities

Contact Us

Phone: 01925 873 235
Email: info@dsuzagroup.co.uk
Registration Number: 10080269

© D'Suza Group 2018 - Powered by Wordpress | D'Suza Group 2018: By D'Suza Group

Pin It on Pinterest