MULTI-STOREY CAR PARK – WARRINGTON

CLIENT

I&H Brown

N

YEAR

2017

DURATION

16 Weeks

VALUE

£100,000.00

PROJECT DESCRIPTION

 

The substructure works complete with piled solution, is 200No 450 CFA piles in a confined area all within close proximity to existing buildings, the general public and existing road network.

The ground floor slab, structural steel frame with trapezoidal, cast in-situ concrete upper floors; masonry, rain-screen cladding, glazed curtain walling and architectural metalwork to the external envelope.

Internally there will be an office construction, services installations including feature inclusive of highway layout changes, drainage, new & diversions of existing statutory services, predominately along Academy Way, Academy Street, Mersey street and bank street with lighting, ticketing and charging points.

KEY FEATURES

 

  • Build of 1,169 space multi-storey car park inclusive of substructure works
  • Piled solution and ground floor slab
  • Structural Steel Frame for multi-storey building with reinforced concrete flooring
  • Working in the heart of Warrington Town Centre

In

Partnership

With

D’Suza Group HQ

Hi-Spec House
14 Liverpool Road
Warrington
WA5 1EE

D’Suza Group London

1 Northumberland Avenue 
Trafalgar Square 
London
WC2N 5BW

Useful Links:

- Sitemap
- Privacy Policy
- Responsibilities

Contact Us

Phone: 01925 873 235
Email: info@dsuzagroup.co.uk
Registration Number: 10080269

© D'Suza Group 2018 - Powered by Wordpress | D'Suza Group 2018: By D'Suza Group

Pin It on Pinterest