We have contracted D’Suza Group to carry out all reinforcement works at one of our job sites and they excelled all expectations.

Not only the site team proved to be very efficient and reliable, but there was also significant cost savings due to their proposed method of work that reduced our time on site significantly.

Concern for health and safety was always shown and a positive appraisal from everyone involved in the project secured a lot more work for us, will definitely use them again in the future.

FILIPE ALMEIDA

CONTRACTS MANAGER, CBS CONCRETING LTD

D’Suza Group have worked with Ideal Form for almost ten years on numerous large scale contracts throughout Scotland and England. Projects such as Immingham Renewable Fuels Terminal, Gladstone Biomass Plant and the Siemens Turbine Facility at Green Port Hull.

Throughout the duration of these projects D’Suza Group worked to extremely tight programmes and provided the required resources in order to achieve many key milestones on the projects, completing on time and within budget whilst maintaining the high level of workmanship expected. Ideal Form would have no hesitation in working with Paul and his team in the future.

RYAN O'KANE

MANAGER, IDEALFORM

DS are a well organised company and have been a pleasure to work with. Always willing to assist with whatever is asked of them. the Site Surveyor and I forged a good working relationship which assisted in delivering the scheme to programme.

GAVIN HULME

CONTRACTS MANAGER, CIVILS

Paul and the Entire Team 

Congratulations to you and the entire team to complete this very large project two weeks ahead of schedule! 

This is a demonstration of the ability and teamwork to accomplish very large projects effectively. 

My thanks to all of you that made this happen. 

STEVE MILTENBERGER

PROJECT COORDINATOR, URENCO

DS recently undertook a reinforced concrete sub contract package for Eric Wright Civil Engineering on the Thrybergh Hydroelectric Scheme. The total scheme value was around £1.2 million and DS package was around £120,000, plus variations.

I can confirm that DS approached the project in a professional manner. They generally worked to programme and were flexible in response to changes on site. The shuttering design went through a number of changes due to site phasing and other requirements outside their remit. All of this was managed in a pro active manner. In terms of health and safety there were no accidents or incidents on site and DS generally employ a well trained and experienced workforce.

Based on my experiences with them on this project I would not have any hesitation in considering them for future works.

CHRIS TETLOW

PROJECT MANAGER, ERIC WRIGHT CIVIL ENGINEERING LTD

D’Suza Group have worked with Ideal Form for almost ten years on numerous large scale contracts throughout Scotland and England. Projects such as Immingham Renewable Fuels Terminal, Gladstone Biomass Plant and the Siemens Turbine Facility at Green Port Hull.

Throughout the duration of these projects D’Suza Group worked to extremely tight programmes and provided the required resources in order to achieve many key milestones on the projects, completing on time and within budget whilst maintaining the high level of workmanship expected. Ideal Form would have no hesitation in working with Paul and his team in the future.

DOMINIC NELSON

CONTRACTS MANAGER, JD EXCAVATIONS

D’Suza Group HQ

Hi-Spec House
14 Liverpool Road
Warrington
WA5 1EE

D’Suza Group London

1 Northumberland Avenue 
Trafalgar Square 
London
WC2N 5BW

Useful Links:

- Sitemap
- Privacy Policy
- Responsibilities

Contact Us

Phone: 01925 873 235
Email: info@dsuzagroup.co.uk
Registration Number: 10080269

© D'Suza Group 2018 - Powered by Wordpress | D'Suza Group 2018: By D'Suza Group

Pin It on Pinterest